I know there are variables and it isn't a consistent timeline, but about how long does a new RAV4 Hybrid build take?
For example, if a hypothetical RAV had a build date of 6/6 in Canada (yup, tomorrow), how long does it take...
To complete the build? One day, two, more?
To be ready for shipment away from the factory?
To arrive on the West Coast depot?
Travel from Depot to Dealer?
Dealer prep to delivery?
Thanks!
Rob
For example, if a hypothetical RAV had a build date of 6/6 in Canada (yup, tomorrow), how long does it take...
To complete the build? One day, two, more?
To be ready for shipment away from the factory?
To arrive on the West Coast depot?
Travel from Depot to Dealer?
Dealer prep to delivery?
Thanks!
Rob